• About
  • Advertise
  • Careers
  • Contact
Wednesday, January 14, 2026
No Result
View All Result
NEWSLETTER
mynewssourceonline
  • Home
  • Politics
  • Entertainment
  • Business
  • Legal
  • Sports
  • Lifestyle
  • World
  • Opinion
  • Home
  • Politics
  • Entertainment
  • Business
  • Legal
  • Sports
  • Lifestyle
  • World
  • Opinion
No Result
View All Result
mynewssourceonline
No Result
View All Result
Home Mains

Kwanyako Water Treatment plant reopens after turbidity

Operations resume at Kwanyako water treatment plant after temporary shutdown caused by high turbidity levels

by admin
October 20, 2025
in Mains, News
0
Kwanyako Water Treatment
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

The Managing Director of Ghana Water Limited (GWL), Adam Mutawakilu, has confirmed that the Kwanyako Water Treatment Plant in the Central Region is now running at full operational capacity, producing water at 100% efficiency after several months of technical challenges.

The plant, which once supplied safe drinking water to thousands, was shut down by the Regional Security Council and the Ghana Water Company Limited after dangerously high turbidity levels were recorded in local rivers and streams due to mining pollution.

The plant had struggled with extremely high turbidity levels—a measure of water cloudiness—which reached over 11,000 NTU, far exceeding the facility’s processing limit of 2,500 NTU.

These issues significantly disrupted water production and supply to surrounding communities.

Addressing journalists at a press conference in Accra on Monday, October 20, 2025, Mutawakilu explained that the improvement followed a series of technical and engineering interventions, including relocating the pumps from the ground to the surface treatment plant to enhance efficiency.

However, the GWL boss cautioned that the current production capacity may not be sustained throughout the upcoming dry season, as falling water levels could reduce output.

He emphasised that “We had to do re-engineering by bringing the pumps up. That is why we are now able to produce 100% water. The Kwanyako Treatment Plant is now working, with no high turbidity beyond the capacity of the plant. As we speak, the Kwanyako Treatment Plant is producing 100% water. But that will not last long because the water level will drop as the dry season comes in.”

Mutawakilu also appealed to corporate organisations and stakeholders to support desilting works at the plant’s pump intakes, noting that financial constraints make it difficult for the company to carry out the exercise alone.

He further reaffirmed Ghana Water Limited’s commitment, alongside the government, to curbing illegal water connections, improving operational efficiency, and protecting the country’s water resources for sustainable supply.

Tags: Ghana Water Limited (Kwanyako
admin

admin

Next Post
Pakistan Afghanistan ceasefire

Pakistan and Afghanistan agree to new ceasefire after more than a week of deadly clashes

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Video: Mahama didn’t fulfill a single of his promises made to us,” says Ekumfi Chiefs

Video: Mahama didn’t fulfill a single of his promises made to us,” says Ekumfi Chiefs

2 years ago
Dr. Adu-Sarkodie CPS

CPS appoints Dr. Adu-Sarkodie as Executive Director

3 months ago

Popular News

  • Sky Train Case: AG’s first witness ordered by court to produce 16 emails

    Judge Rejects AG’s Opposition, Admits Emails on Accra Sky Train Project into Evidence

    0 shares
    Share 0 Tweet 0
  • P.Y. Atta writes: The malaise of politicisation of state institutions; MIIF and the heavy cost of institutional breakdown

    0 shares
    Share 0 Tweet 0
  • Address lawless happenings at MIIF – Expert warns

    0 shares
    Share 0 Tweet 0
  • Education watch: 30,000 classrooms in Ghana lack teachers

    0 shares
    Share 0 Tweet 0
  • Support Jospong’s sustainability drive – Dr Gloria Kusi advocates

    0 shares
    Share 0 Tweet 0

Connect with us

  • About
  • Advertise
  • Careers
  • Contact
Call us: +233208991455

© 2025 Mynewssourceonline - All rights reserved

Powered by
...
►
Necessary cookies enable essential site features like secure log-ins and consent preference adjustments. They do not store personal data.
None
►
Functional cookies support features like content sharing on social media, collecting feedback, and enabling third-party tools.
None
►
Analytical cookies track visitor interactions, providing insights on metrics like visitor count, bounce rate, and traffic sources.
None
►
Advertisement cookies deliver personalized ads based on your previous visits and analyze the effectiveness of ad campaigns.
None
►
Unclassified cookies are cookies that we are in the process of classifying, together with the providers of individual cookies.
None
Powered by
No Result
View All Result
  • Home
  • Politics
  • Business
  • Entertainment
  • Banking
  • Legal
  • Sports
  • Lifestyle
  • World
  • Opinion

© 2025 Mynewssourceonline - All rights reserved