• About
  • Advertise
  • Careers
  • Contact
Monday, February 9, 2026
No Result
View All Result
NEWSLETTER
mynewssourceonline
  • Home
  • Politics
  • Entertainment
  • Business
  • Legal
  • Sports
  • Lifestyle
  • World
  • Opinion
  • Home
  • Politics
  • Entertainment
  • Business
  • Legal
  • Sports
  • Lifestyle
  • World
  • Opinion
No Result
View All Result
mynewssourceonline
No Result
View All Result
Home Africa

South Africa junior miner upward spiral launches new East Rand gold project

South Africa’s upward spiral ventures into East Rand with promising gold initiative

by admin
February 9, 2026
in Africa
0
South Africa gold

Underground gold mine

0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

A privately owned mining company is preparing to begin full-scale gold production on South Africa’s historic East Rand, betting that high prices and tight cost control can revive previously marginal deposits. 

Upward Spiral 1471 (Pty) Ltd says it is ready to commence mining at its newly acquired Snake Road Mining Right in Benoni after completing regulatory approvals, geological modelling, and open-cast planning late last year. The move marks a new chapter for gold extraction in a region that once formed the backbone of South Africa’s mining economy. 

The Snake Road project focuses on a known gold-bearing reef extending from the Snake Road area towards the company’s existing Van Ryn surface operation. Historically, the site was used mainly for aggregate mining, with only limited gold recovered through surface reef picking. Today’s gold price environment, however, has shifted the economics. 

Managing director Jackie Pahad described the project as a “controlled, compliant and sustainable mining development,” adding that it is designed to unlock value while delivering “long-term socio-economic benefits to surrounding communities.” 

Flexible production, disciplined capital 

Technically, the project has been structured to remain viable across price cycles. Metallurgical manager Thabang Masuku said that at the planned production rate, the mine is economically sound, with scope to scale up if conditions allow. The installation of a second mill could double monthly processing capacity, enabling the company to take advantage of favourable gold markets. 

Snake Road is a near-surface, conventional operation supported by an inferred resource of about 128,603 ounces of gold. Peak output is expected to rise from 579 troy ounces per month to as much as 1,158 ounces under optimal conditions, underpinning an initial mine life of roughly 10 years. 

Environmental controls are central to the design. Instead of a tailings dam, filtered tailings will be blended with sand from a rehabilitation programme for toll treatment and safe disposal. Water will be recycled through filtered systems and thickener overflow, reducing freshwater demand. 

The project is expected to employ about 68 permanent staff initially, with numbers rising as operations expand. Recruitment will prioritise nearby communities, alongside graduate development and skills training. 

Fully licensed by the Department of Mineral and Petroleum Resources, the operation complies with environmental, water-use, waste-management and air-emission requirements. Pahad said the company aims to exceed minimum standards. 

Investment strategist Adrian Saville of Cannon Asset Managers said the current gold cycle allows “disciplined operators to generate strong returns even at a smaller scale,” making such projects attractive due to low capital intensity and clear revenue visibility. 

While modest in output, Snake Road reflects a broader shift in South Africa’s gold sector: smaller, selective operations replacing mega-mines. For investors, it signals capital discipline, ESG alignment and renewed confidence in the country’s mining framework. 

Tags: South Africa
admin

admin

Next Post
UN Congo

South Africa to withdraw its troops from UN peacekeeping mission in Congo

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Parliament Okada

Parliament passes Okada bill to legalise business

2 months ago
United Nigeria airlines

United Nigeria airlines names aircraft after J.J. Rawlings

3 months ago

Popular News

  • Sky Train Case: AG’s first witness ordered by court to produce 16 emails

    Sky Train Case: Court Rejects Attorney General’s Attempt to Re-examine Witness

    0 shares
    Share 0 Tweet 0
  • IGP under fire over alleged promotion of family members

    0 shares
    Share 0 Tweet 0
  • Mind your business — Ayawaso East NDC executives fire Majority

    0 shares
    Share 0 Tweet 0
  • South Africa to withdraw its troops from UN peacekeeping mission in Congo

    0 shares
    Share 0 Tweet 0
  • South Africa junior miner upward spiral launches new East Rand gold project

    0 shares
    Share 0 Tweet 0

Connect with us

  • About
  • Advertise
  • Careers
  • Contact
Call us: +233208991455

© 2025 Mynewssourceonline - All rights reserved

Powered by
...
►
Necessary cookies enable essential site features like secure log-ins and consent preference adjustments. They do not store personal data.
None
►
Functional cookies support features like content sharing on social media, collecting feedback, and enabling third-party tools.
None
►
Analytical cookies track visitor interactions, providing insights on metrics like visitor count, bounce rate, and traffic sources.
None
►
Advertisement cookies deliver personalized ads based on your previous visits and analyze the effectiveness of ad campaigns.
None
►
Unclassified cookies are cookies that we are in the process of classifying, together with the providers of individual cookies.
None
Powered by
No Result
View All Result
  • Home
  • Politics
  • Business
  • Entertainment
  • Banking
  • Legal
  • Sports
  • Lifestyle
  • World
  • Opinion

© 2025 Mynewssourceonline - All rights reserved